Inquiry NowWidening And Improvement Of Ru in Bicholim - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Widening And Improvement Of Ru" in Bicholim, India.
- Opening Date : Fri 22nd May, 2026
- Closing Date : Wed 20th May, 2026
- ₹ 28075697.00
- NTID 45215672
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
561515.00 -
Document Cost
20000.00 -
Estimated Cost
28075697.00
BOQ Items Total Items : 27 | Total Qty : 44538.95
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metresas per MORTH 202 II By Mechanical Means b Prestressed/reinforced cement concrete grade M-20 & above | 13.20 | Cum |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metresas per MORTH 202 XIII Removing all types of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works as per MORTH specification202 Upto 600 mmm dia | 20.00 | m |
| 3 | Transportation & carriage materials | 20.40 | Cum |
| 4 | Earthwork in excavation of foundation of structures of culvert abutments, piers, retaining walls etc.as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3 m depthas per MORTH Specification 304 INCLUDING DEWATERING Ordinary soil Mechanical Means | 1090.42 | Cum |
| 5 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil | 166.58 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054