- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Archaeological Survey of India
- >
NTID 43949537
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowUpgradation Procurement Of Her in Tezpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Upgradation Procurement Of Her" in Tezpur, India.
- Opening Date : Tue 24th February, 2026
- Closing Date : Mon 23rd February, 2026
- ₹ 3535133.00
- NTID 43949537
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
88400.00 -
Document Cost
Refer Documents -
Estimated Cost
3535133.00
BOQ Items Total Items : 31 | Total Qty : 11036.52
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Execution of works | ||
| 2 | Provision for pointing & edging of the wall etc. with lime sand -surkhi mortar (1:1:1) mixing with organic materials after raking on the joints of wall surface including cleaning, washing etc. CompleteMaterials: Unslaked = 20 kg, methi = 0.1 kg, Brick surkhi =0.03 cum, river sand = 0.03 cum, molasses = 0.3, gul nut = 0.2 kg, mati dal = 0.15 kg, sika latex = 0.1 ltr., white katha = 0.03 kg bel gum = 2 nos. Manpower: unskilled =3 nos, Semi skilled = 1 no., 1st class masion = 1 no. | 10.43 | SQM |
| 3 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5m. | 2.68 | Cum |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport up to a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 420 | Cum |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 0.7 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054