- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of Thunchath Ezhuthachan Malayalam University
- >
NTID 43236035
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowThunchath Ezhuthachan Malayala in Malappuram - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Thunchath Ezhuthachan Malayala" in Malappuram, India.
Thunchath Ezhuthachan Malayalam University
Malappuram, Kerala, India
NTID 43236035
- Opening Date : Mon 29th December, 2025
- Closing Date : Fri 26th December, 2025
- ₹ 155700.00
- NTID 43236035
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 8 | Total Qty : 214.07
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | 2.6.1 Earth work excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.50m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.50m, disposal of earth to be levelled and neatly dressed. all kinds of soil. | 17.27 | cum |
| 2 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All works up to plinth level 1:2:4 (1 cement:2 course sand: 4 graded stone aggregate 20mm nominal size) | 1.09 | cum |
| 3 | od165828/2024-2025 Dry rubble masonry with hard stone in foundation and plinth including cost of through stone and bond stone. | 8.45 | cum |
| 4 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all works up to plinth level:1:1.5:3 ((1 cement:1.5 course sand: 3 graded stone aggregate 20mm nominal size) | 1.78 | cum |
| 5 | 5.22.6 Steel reinforcement for RCC work including straightening, cutting, bending, placing in positionand binding all complete up to plinth level Thermo-Mechanically Treated Bars of grade Fe- 500Dor more. | 172.48 | kg |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054