- Home
- >
- Tender
- >
- Andhra Pradesh Tender
- >
- Department of Hindustan Shipyard Limited
- >
NTID 47249182
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowTender For Air Conditioning Sy in Visakhapatnam - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Tender For Air Conditioning Sy" in Visakhapatnam, India.
Hindustan Shipyard Limited
Visakhapatnam, Andhra Pradesh, India
NTID 47249182
- Opening Date : Mon 2nd November, 2026
- Closing Date : Mon 2nd November, 2026
- ₹ 0.00
- NTID 47249182
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
Refer Documents -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 2 | Total Qty : 1
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | The following Air conditioning system works to be carried out and satisfactory trials to be showned to ship staff.All required OEM spares and consumables are procure,supply and fitment in contractor scope.all machining works,pullers,welding,cutting and brazing works are in contractor scope. | ||
| 2 | Complete Air conditioning system to be overhauled, System converted from R-22 refrigerant to R407c complied refrigerant and satisfactory trials to be showned. 1. A/C Compressor needs completely overhauled with new OEM spares. (Compressor Model. Earlyle 06EA599600) 2. Blower assembly not rotating and jammed,required renewal complete Blower unit. 3. Evaporator coil fins damaged needs replacement of complete evaporator coil unit. 4. Heating coil to be removed from place. 5. AHU filter frame damaged needs filter replacement. 6. Filter inspection door corroded and damaged same to be replacement. 7. Drier inlet & Outlet valves and drier core needs replaced with new one, 8. HP/LP/oil pressure gauge and cut-outs needs replacement. 9. Compressor oil, Expansion valve, Condenser relief valve and required R407c refrigerant to be replaced. 10. System flushing, pressure testing to be carried out with nitrogen for 24 hrs and to ensure complete leak free 11. After successful pressure testing, system vaccumaizing and gas charging to be carried out. 12. System trials to be showned to ship staff. | 1 | LS |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054