- Home
- >
- Tender
- >
- Madhya Pradesh Tender
- >
- Department of Raja Ramanna Centre for Advanced Technology Indore
- >
NTID 46048473
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowSupply Installation Testing in Indore - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Supply Installation Testing " in Indore, India.
Raja Ramanna Centre for Advanced Technology Indore
Indore, Madhya Pradesh, India
NTID 46048473
- Opening Date : Fri 21st August, 2026
- Closing Date : Tue 18th August, 2026
- ₹ 7750000.00
- NTID 46048473
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
155000.00 -
Document Cost
Refer Documents -
Estimated Cost
7750000.00
BOQ Items Total Items : 12 | Total Qty : 1
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supply, installation, testing and commissioning (SITC) of 150 Tonnage capacity (minimum at 45 degC) Air Cooled Chiller with adiabatic cooling kit against buyback of 150 tonnage capacity Air Cooled Chiller (Make Blue Star, Model no. LCAX2-1055D) as per technical specification. | ||
| 2 | Supply, Installation,Testing and Commissioningof Eurovent/AHRI certified Aircooled chiller as per tender specification of 150 TR actual capacity at 45 degC ambient temperature (without adiabatic kit) and operating conditions as given below with screw compressors with VFD and single refrigerant circuits operating on refrigerant R-134a/equivalent or better driven by suitable motor, air-cooled condenser copper tubes & fins with anti corrosion coating, flooded/DX type shell & tube evaporator,VFD on condenser fans, flow switches at chiller inlet/outlet, initial refrigerant & oil charged from the factory, microprocessor based control panel, spring isolators of suitable capacity all mounted on M.S. frame.Chiller shall be BMS compatible with its control panel having BACnet/Modbus/IP based network platform with ethernet/RS-485 port for compatible with existing PLC based system. The motor shall be with class 'F' Insulation suitable for 415 volts ±10%, 50Hz± 5 %, three phase AC supply. Factory testing of the chiller at AHRI approved test bed. | 1 | No. |
| 3 | Site Operating Parameters | ||
| 4 | Air Entering Temp. to the Condenser: 45ºC | ||
| 5 | Chiller :- CHW in at 12 ºC & CHW Out at 7ºC |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054