- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Ayodhya Faizabad Development Authority
- >
NTID 43223171
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowSupply Construction And Instal in Faizabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Supply Construction And Instal" in Faizabad, India.
Ayodhya Faizabad Development Authority
Faizabad, Uttar Pradesh, India
NTID 43223171
- Opening Date : Wed 24th December, 2025
- Closing Date : Tue 23rd December, 2025
- ₹ 8466560.00
- NTID 43223171
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
169350.00 -
Document Cost
5900.00 -
Estimated Cost
8466560.00
BOQ Items Total Items : 5 | Total Qty : 64631.56
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | DESCRIPTION OF ITEM | ||
| 2 | Supply and fixing of MS work buildup section /frame works including cutting fabrication of MS railing ,painting with approved paint including all work itc complete as per direction by I/E. DSR-23/10.25.2 | 63409.16 | KG |
| 3 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture DSR 23 13.48.3 | 1150.00 | SQM |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer,Nominal concrete 1:3:6 or richer mix ( equivalent design mix) DSR 23 15.2.1 | 50.12 | CUM |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [FOR LINTEL] M-20. As in item above but in R.C.C. Raft foundation and footing with approved stone ballast. (Using 1:1.5:3 Mix concrete) dsr-23/5.3A | 22.28 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054