Inquiry NowStrengthening Of Bund In Sy N in Tiswadi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Strengthening Of Bund In Sy N" in Tiswadi, India.
- Opening Date : Tue 23rd December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 24159469.00
- NTID 42921995
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
483190.00 -
Document Cost
20000.00 -
Estimated Cost
24159469.00
BOQ Items Total Items : 8 | Total Qty : 18487.8
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the material such as soil, silt, sand, clay, gravel moorum of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock, fissured/shattered rock, decomposed or weathered rock and such other materials in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted inclusive of chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom providing barricading, danger lighting , guarding etc & back filling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and lifts etc. as per specification & drawing and directed by the Engineer-in-charge etc complete. | 3003.000 | cum |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 520.000 | cum |
| 3 | Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: Upto 2.5 meters long pile | 3250.000 | Metre |
| 4 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) : Upto 2.5 meters long pile | 2860.000 | Metre |
| 5 | Centering & shuttering including Strutting, Propping & removal of form work for : Foundations, Footings, Bases for columns and mass concrete | 1950.000 | Sq.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054