- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of Rural Development And Panchayat Raj Department
- >
NTID 46033847
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowStrengthening And 5 Year Maint in Nagarcoil - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Strengthening And 5 Year Maint" in Nagarcoil, India.
Rural Development And Panchayat Raj Department
Nagarcoil, Tamil Nadu, India
NTID 46033847
- Opening Date : Thu 6th August, 2026
- Closing Date : Thu 6th August, 2026
- ₹ 0.00
- NTID 46033847
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
155000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 106 | Total Qty : 21236.35
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Strengthening of Thachakodu Manavilagam Korottorkulam via vazapalli road in Adaikkakuzhi Panchayat of Munchirai Panchayat Union KM 0/0-1/730 R -115 VPR | ||
| 2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 455.04 | Cum |
| 3 | Earthwork Excavation for formation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A | 71.1 | Cum |
| 4 | Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc. | 1264 | Cum |
| 5 | collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | 71.1 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054