- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of V O CHIDAMBARANAR PORT TRUST
- >
NTID 42758653
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowShifting Of Existing 3 Nos Va in Tuticorin - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Shifting Of Existing 3 Nos Va" in Tuticorin, India.
V O CHIDAMBARANAR PORT TRUST
Tuticorin, Tamil Nadu, India
NTID 42758653
- Opening Date : Thu 20th November, 2025
- Closing Date : Wed 19th November, 2025
- ₹ 0.00
- NTID 42758653
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
9700.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 14 | Total Qty : 709
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork excavation in trenches for foundation in sand and other loose soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage of water wherever necessary etc., complete complying with AISS and as directed by the departmental officers. | 190.00 | Cum |
| 2 | Providing and laying Plain Cement Concrete 1:4:8 (One part of cement, 4 parts of M. Sand (Crushed Stone Sand) & 8 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers. | 1.00 | Cum |
| 3 | Brick work in Cement Mortar 1:5 (M. Sand (Crushed Stone Sand)) ( One cement, five M. Sand (Crushed Stone Sand)) using chamber burnt bricks for walls in Ground Floor of the building including cost of all materials, labour, curing etc., complete complying with AISS and as directed by the departmental officers. | 24.00 | Cum |
| 4 | Plastering the Brick work 15 mm thick in Cement Mortar 1:5 (Plastering Sand (P-Sand)) (One cement, five Plastering Sand (P-Sand)) for all faces of walls (even and uneven) in all floors upto full height of the building including necessary scaffolding, racking of masonry joints, cleaning, curing etc., complete complying with AISS and as directed by the departmental officers. | 183.00 | Sqm |
| 5 | Providing and fixing R.C.C. Pre-cast slab 75mm thick of various size in Cement Concrete 1:1.5:3 including all labour, materials, form work, reinforcement, conveyance and fixing the slab etc., complete complying with AISS and as directed by the departmental officers. | 30.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054