Inquiry NowSh Providing Plastering Wood in Bilaspur (HP) - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Sh Providing Plastering Wood " in Bilaspur (HP), India.
Bus Stands Management and Development Authority
Bilaspur (HP), Himachal Pradesh, India
NTID 43907919
- Opening Date : Tue 24th February, 2026
- Closing Date : Tue 24th February, 2026
- ₹ 834160.00
- NTID 43907919
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 34 | Total Qty : 4966.265
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (One cement isto Four fine sand) including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 63.2 | Per Square Meter |
| 2 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :With cement mortar 1:6 (One cement isto Six course sand) including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 7.87 | Per cubic meter |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within all lead as per direction of Engineer-in-charge dismanled /servicale materials to be handed over to the Deptt.including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 4.30 | Per cubic meter |
| 4 | Kota stone slabs 20 mm (Twenty milimeter) thick in risers of steps, skirting, dado and pillars laid on 12 mm (Twelve milimeter) (average) thick cement mortar 1:3 (One cement isto Three coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 23.22 | Per Square Meter |
| 5 | 15 mm (Fifteen milimeter), cement plaster on the rough side of single or half brick wall of mix : in cement mortar 1:4 (One cement isto Four fine sand) including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | 59.50 | Per Square Meter |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054