- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of WEST BENGAL INDUSTRIAL DEVELOPMENT CORPORATION LIMITED
- >
NTID 47262757
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowSelection Of Consultant For Pr in Kolkata - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Selection Of Consultant For Pr" in Kolkata, India.
WEST BENGAL INDUSTRIAL DEVELOPMENT CORPORATION LIMITED
Kolkata, West Bengal, India
NTID 47262757
- Opening Date : Tue 17th November, 2026
- Closing Date : Fri 13th November, 2026
- ₹ 0.00
- NTID 47262757
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
200000.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 4 | Total Qty : 3
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | The Employer –“Managing Director, West Bengal Industrial Development Corporation invites for Expression of Interest is invited for Engagement of Consultant/Consulting firm/Organization/ Reputed Technical Institution/ Reputed Technical Institute for vetting and scrutiny of drawings and documents concerned with Building plan sanction, Plinth level verification and generation of occupancy report and other related services as per West Bengal Municipal (Building) Rules, 2007 through OBPAS (‘e-Grihanaksha’) portal under planning Division of WBIDC. | ||
| 2 | Stage –1, Process of Building Plan:-Recommendation for consultancy together with scrutiny of Building Plan drawing and documents including structural, architectural and all other necessary details as per the West Bengal Municipal (Building)rules- 2007 | 1 | sqm |
| 3 | Stage – 2, Plinth Level verification Certificate: Recommendation of Plinth Level Inspection and verification report after plinth level verification physically at site and in accordance with the sanctioned plan | 1 | sqm |
| 4 | Stage – 3, Occupancy Report: Recommendation of occupancy report after completion of building in all respect and by abiding the sanction building plan drawing in stage – 1, in coordination with all concern departments for having NOC from their end. | 1 | sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054