- Home
- >
- Tender
- >
- Rajasthan Tender
- >
- Department of Rajasthan State Highways Authority
- >
NTID 46084501
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRoutine Maintenance On Ajeetga in Sikar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Routine Maintenance On Ajeetga" in Sikar, India.
- Opening Date : Mon 3rd August, 2026
- Closing Date : Mon 3rd August, 2026
- ₹ 43723000.00
- NTID 46084501
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
874460.00 -
Document Cost
5000.00 -
Estimated Cost
43723000.00
BOQ Items Total Items : 56 | Total Qty : 37528119.97
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Restoration of rain cuts with soil, Morrum, gravel or a mixture of these including all leads and lifts and cost of arrangement of land, clearing the loose soil, benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting with plate compactor or power rammer to restore the original alignment levels & slopes complete as per MoRTH specification Clause 3002. | 4061.77 | Cum |
| 2 | Repair of potholes by wet mix macadam material by removal of all failed material ,trimming of completed excavation to provide firm vertical faces ,cleaning of surfaces ,compacting base of excavation as per clause 503,back filling the pot holes with wet mix macadam material by manual means as per clause 406, compacting with roller 8-10T,trimming and finishing the surface to form a smooth continuous surface. | 1181.91 | Cum |
| 3 | Filling pot-holes and patch repairs with bituminous concrete,40 mm with removal of all failed material, trimming of completed excavation to provide firm verticalfaces, cleaning of surface, painting of tack coat on the sides and base of excavation as per Clause 503 back filling the pot holes with hot bituminous material using 60/70 grade bitumen @ 5.0% oftotalmix &mixed inhotmix plant40-60 TPH capacity and carriage with all leads as per clause 509, compacting with smooth wheel roller 8-10 tonne, trimming & finishing the surface to form a smooth continuous surface, all as per MoRTH specification Clause 3004.2 | 4555.25 | Sqm |
| 4 | Filling of crack using slow-curing bitumen emulsion and applying crusher dust in cracks complete as per MoRTH specification clause 3004.3.3 | 36195 | Rmtr |
| 5 | Supply,placingand compacting readymadecoldbituminous pothole patching mix in accordance with IRC : 116-2014 Specifications in 50 Kg Plastic - lined sturdy bags with 10 Km. average lead for supply and 20 Km average lead for placement. Mix Shall contain at least 5.6 % MC-800 Cut-back bitumen and suitable anti-stripping agent. Mix shall be workable and usable for at least 6 months. All 50 Kg. bags shall be transported to a storage facility designated by the Engineer. Since the mix contains volatile kerosene, sealed bags shall not be stored in a closed building or warehouse. No open flame or smoking shall be permitted near thestored mix. | 250 | Per 50 Kg bags |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054