- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Gorakhpur Industrial Development Authority
- >
NTID 47255394
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRoad Widening And Rcc Drain I in Gorakhpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Road Widening And Rcc Drain I" in Gorakhpur, India.
Gorakhpur Industrial Development Authority
Gorakhpur, Uttar Pradesh, India
NTID 47255394
- Opening Date : Tue 17th November, 2026
- Closing Date : Tue 17th November, 2026
- ₹ 64301973.00
- NTID 47255394
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
1287000.00 -
Document Cost
2950.00 -
Estimated Cost
64301973.00
BOQ Items Total Items : 26 | Total Qty : 71689.11
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation grass, bush, wood, trees and saplings of girth up to 30cm., Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area cleared.. | 23455 | Sqm |
| 2 | Scrfying the exsitng Btumen Road on Eixgestng Road Scrfying old Surafase Bitumen road | 5250 | Sqm |
| 3 | Dismantling sundried RCC work including stacking of dismantled material as directed by the Engineer-incharge within a distance of 60 metres (200 ft.).as per SI No 691 | 25.5 | Cum. |
| 4 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- | 2536.8 | Cum. |
| 5 | Cement concrete with cement 4cm gauge Stone Ballast and cement in proprtion of 6:3:1 n foundaton and under floor ncluding supply of all materals labour and tools and plants etc. required for proper completon for the Work SI no275 | 110.32 | Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054