- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of PRADHAN MANTRI GRAM SADAK YOJANA
- >
NTID 45126439
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRestoration Work At Bunga To K in Tharali - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Restoration Work At Bunga To K" in Tharali, India.
PRADHAN MANTRI GRAM SADAK YOJANA
Tharali, Uttarakhand, India
NTID 45126439
- Opening Date : Mon 18th May, 2026
- Closing Date : Mon 18th May, 2026
- ₹ 0.00
- NTID 45126439
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
56000.00 -
Document Cost
3540.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 5 | Total Qty : 747.253
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for Structures :Excavation in foundation for cross drainage structures, Retaining walls, brest walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer-in-charge aslo including supply of all materials, labour, T&P etc. required for proper completion of work. | 109.350 | Cum. |
| 2 | Random Rubble Masonry 1:6 in cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 228.310 | Nos |
| 3 | Random Rubble Stone Masonry laid in Dry cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc.(As per PWD Uttarakhand specifications) | 174.851 | Cum. |
| 4 | HP stone filling in back of walls includings supply of all material, labour, T&P etc. required for proper completion of the work for R/W and B/W | 81.400 | Cum. |
| 5 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including suplu of all material,labour, T&P etc. required for proper completion of the work.as per drawings and technical specifications | 153.342 | Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054