Inquiry NowRestoration Of Sundarban Emban in Basirhat - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Restoration Of Sundarban Emban" in Basirhat, India.
Irrigation and Waterways Department
Basirhat, West Bengal, India
NTID 43958434
- Opening Date : Wed 25th February, 2026
- Closing Date : Mon 23rd February, 2026
- ₹ 258051.00
- NTID 43958434
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 14 | Total Qty : 12692.9
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | 243.00 | Cum |
| 2 | Extra rate over Item Nos.1.01 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. i) 02 (Two) Nos. Extra Lead | 73.00 | Cum |
| 3 | i) 03 (Three) Nos. Extra Lead | 85.00 | Cum |
| 4 | Extra rate over Item Nos.1.01 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre i) 01 ( One ) No. Exrtra Lift | 85.00 | Cum |
| 5 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts both ways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of NB :- Measurement to be taken on the basis of stack measurement / pre- post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. B) Beyond 1.00 km and upto 2.00 km | 104.10 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054