Inquiry NowRestoration Of Damaged Existin in Kanyakumari - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Restoration Of Damaged Existin" in Kanyakumari, India.
Department of Fisheries and Fishermen Welfare
Kanyakumari, Tamil Nadu, India
NTID 43157486
- Opening Date : Tue 30th December, 2025
- Closing Date : Mon 29th December, 2025
- ₹ 36200000.00
- NTID 43157486
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
191000.00 -
Document Cost
Refer Documents -
Estimated Cost
36200000.00
BOQ Items Total Items : 9 | Total Qty : 19115.5
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Formation of Core layer for rubble mound break water with quarry run hard blue granite stone of weight 10Kg- 500Kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 1.33 on lee side and 1:2 on sea side with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 10350.00 | MT |
| 2 | Formation of Secondary layer for rubble mound break water with quarry run hard blue granite stone of weight 1000Kg- 2000Kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slope 1 : 1.5 with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 5939.00 | MT |
| 3 | Formation of Primary Layer for rubble mound break water with quarry run hard blue granite stone of weight ( 300kg to 600Kg) & (300kg to 900kg) having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 1096.00 | MT |
| 4 | Removing the 5Cum/12T Corelocs from the existing main break water using crane (or) other suitable machineries, loading transporting by lorries/tippers to placing at the stacking yard as directed by the Departmental Officers. (The payment shall be made on Pre-levels/Pre-measurements before execution and after execution). | 429.00 | Nos |
| 5 | Replacing the 5Cum/12T Corelocs on the proporsed break water trunk portion sides using crane (or) other suitable machineries, transporting by lorries/tippers from the stacking yard complete as directed by the Departmental Officers. (The payment shall be made on Pre-levels/Pre-measurements before execution and after execution). | 429.00 | Nos |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054