- Home
- >
- Tender
- >
- Punjab Tender
- >
- Department of Military Engineer Services
- >
NTID 46096656
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair Of Road Potholes Inter in Abohar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair Of Road Potholes Inter" in Abohar, India.
- Opening Date : Wed 19th August, 2026
- Closing Date : Tue 18th August, 2026
- ₹ 5000000.00
- NTID 46096656
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
100000.00 -
Document Cost
500.00 -
Estimated Cost
5000000.00
BOQ Items Total Items : 20 | Total Qty : 3574.8772727273
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | M&L for preparing existing black top surface/ BM by brushing with wire brushed for removing caked mud etc sweeping with brooms and finally fanning to cleaned surface with gunny bags to remove all loose dirt etc from black top surface complete all as specified and as directed. | 479 | 10 Sqm |
| 2 | Material & labour applyng evenly a tack coat of cationic bitumen emulsion (RS-1) confirming to IS 8887@2 to 3 kg sqm on DBM/ bitumenous surfaces as specified in table 500-5 of MORTH specifications for road and bridge works 2013 using mechanical sprayers complete all as specified and as directed. | 479 | 10 Sqm |
| 3 | Providing and laying Premix Bituminous Concrete 40mm consolidated thickness with 5.5% binder (paving bitumen of grade VG-30) content by weight of total mix and crushed agregates of grading 2 with mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic power finisher and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 507 MORTH (5th Rev) specification and as specified and directed. Note :- (i) The contractor shall quote the rate against item considering 5.5 % VG-30 bitumen content, Job mix formula as per clause No. 505.3.3 of MORTH (5th revision) for BC shall be worked out from any Govt Lab/Govt Engg college/CTL for obtaining optimum binder content (OBC) by the contractore and same shall be submit for approval of Accepting Officer through GE before execution. The cost thereof shall deemed to be included in quoted unit. Any variation in binder content on minus side shall be adjusted @ Rs 50kg of binder and NO adjustment shall be made on plus side. (ii) Cost of filler i.e cement (OPC) is deemed to be included in quoted unit rate. (iii) After spreading of mix as as per clause 507.4.7 MORTH (5th revision) entire surface during the operation shall be rolled with road roller 8-10 tonne (smooth wheeled) followed with vibratory road roller of 8-10 tonne static weight, followed by finished rolling 6 to 8 tonne smooth wheel tendom roller as per clause No 507.4.8 MORTH (5th revision) and cost of the same is deemed to be included in quoted rates. (iv) The contractor shall intimate the planned date of incorporation of mix in advance to GE. Premix will be approved in writing by Rep of Accepting Officer at plant site before incorpoation of the same in the work. (v) Payment shall be made after conducting bitumen extraction test after every laying every 500 units and cost is deemed to be included in the quoted rates. For any variation in bitumen contents the re-testing to be got done by contractor at without any extra cost. (vi) Top of road surface shall be broomed on next day after completion of rolling and cost of the same is deemed to be included in quoted rates. | 479 | 10 Sqm |
| 4 | Providing and laying Premix Bituminous macadam of consolidated thickness n. exc. 75mm, using paving bitumen binder of grade VG-30 @ and binder content of 4% by weight of total mix with mixing of aggregates and VG-30 bitumen in electronic operated 100-120 TPH batch type hot mix plant, transporting the hot mix from HMP to work site by tippers and laying with hydrostatic paver finisher (Paver shall not be compulsory in case of patch work using B.M.) and as per approved mix and rolled & compacted to required camber and gradient with 8 to 12 tonne smooth wheeled, vibratory and tandem roller, complete all as per Clause 504 MoRTH (5th Rev) specification and as specified and directed. Note :- (i) The contractor shall quote the rate against item considering 4 % VG-30 bitumen content, Job mix formula as per clause No. 505.3.3 of MORTH (5th revision) for BM shall be worked out from any Govt Lab/Govt Engg college/CTL for obtaining optimum binder content (OBC) by the contractor and same shall be submit for approval of Accepting Officer through GE before execution. The cost there of shall be deemed to be included unit rate. Any variation in binder content on minus side shall be adjusted @ 50/kg of binder and No adjustment shall be made on plus side. (ii) The BM shall be covered with top layer/wearing course within a maximum of 48 hours. If there is to be any delay by the contractor, course shall be covered by seal coat to the requirement of clause 512 of MORTH (5th revision) before opening to the traffic. The seal coat in such cases shall be considered incidental to the work and shall not be paid for separately. (iii) The contractor shall intimate the planned date of incorporation of mix in advance to GE. Premix will be approved in writing by Rep of Accepting Officer at plant site before incorpoastion of the same in the work. (iv) Paver shall not be compulsory in case of patch work using BM. (v) Payment shall be made after conducting bitumen extraction test after every laying every 500 units and cost is deemed to be included in the quoted rates. For any variation in bitumen contents the re-testing to be got done by contractor at without any extra cost. (vi) Repair to pot holes shall be carried out as directed by Engineer-in-charge under this item and not measured separately, cost is deemed to be included in the quoted rates. | 239.5 | Cum |
| 5 | M & L for 2.5mm thick road marking thermoplastic reflective paint to be carried out mechanically with hot application of material (painting material @ 5 Kg /Sqm ) and glass beads @ 250 gm/Sqm confirming to CI No. 803.4 of MoRTH in strips of 100/150 mm width on road surfaces complete all as specified and directed. | 217.72727272727 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054