ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair Of Road Paradise Plasti in Gautam Budnagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair Of Road Paradise Plasti" in Gautam Budnagar, India.
Uttar Pradesh State Industrial Development Corporation Limited
Gautam Budnagar, Uttar Pradesh, India
NTID 43016077
- Opening Date : Mon 22nd December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 11538662.00
- NTID 43016077
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
272312.00 -
Document Cost
4557.00 -
Estimated Cost
11538662.00
BOQ Items Total Items : 13 | Total Qty : 13359.32
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supply & Stacking of 45-63 mm gauge approved stone ballast (10cm loose) for patches & top coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer -in- Charge. | 257.00 | Cum |
| 2 | Supply & Stacking of 22.4-53 mm gauge approved stone ballast (10cm loose) for patches & top coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer -in- Charge. | 269.00 | Cum |
| 3 | Supply & Stacking of crushed stone dust for consolidation of stone ballast as screening material including octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 78.90 | Cum |
| 4 | Consolidation of 45-63 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge. | 257.00 | Cum |
| 5 | Consolidation of 22.4-53 mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water aiso including labour for spraying screening material to be used for blinding purpose and also ineluding cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor hinself at his own cost as per direction of Engineer-in-charge. | 269.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054