- Home
- >
- Tender
- >
- Punjab Tender
- >
- Department of Military Engineer Services
- >
NTID 46084208
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair Maint To Under Ground in Abohar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair Maint To Under Ground" in Abohar, India.
- Opening Date : Tue 18th August, 2026
- Closing Date : Mon 17th August, 2026
- ₹ 2500000.00
- NTID 46084208
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
500.00 -
Estimated Cost
2500000.00
BOQ Items Total Items : 96 | Total Qty : 8377.62
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Taking out unservicable XLPE HT Cable off size 95 Sqmm 3 core complete all as specified and directed by Engineer-in- charge. Note: Excavation,earth work required for item shall be measured and paid seperately under respective items of this Schedule. | 270 | RM |
| 2 | Supplying, laying, jointing and testing XLPE insulated,screened,PVC beded,galvanised steel strip or wire armoured,clectric power cables (heavy duty)with aluminium conductor HT cable 11000 volts grade with cross sectional area 95 sqmm 3 core laid in trenches/ ducts/ along poles/ through pipes complete all as specified & directed by Engineer-in- charge. Note: Excavation & earth work shall be measured & paid separately under appropriate item of this Schedule. | 270 | RM |
| 3 | Excavation in trenches not exceeding 1.5 mtr depth width and not exceeding 1.5m depth for laying under ground cable in loose/soft soil complete all as specified & directed by Engineer-in- charge. | 90 | CUM |
| 4 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm complete all as specified & directed by Engineer-in- charge. | 87.82 | CUM |
| 5 | Removal of surplus soil obtained from excavated material not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified & directed by Engineer-in- charge. | 2.18 | CUM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054