- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of GOVERNMENT OF ORISSA
- >
NTID 47199231
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair And Renovation Of Uphc in Nabarangpur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair And Renovation Of Uphc " in Nabarangpur, India.
GOVERNMENT OF ORISSA
Nabarangpur, Odisha, India
NTID 47199231
- Opening Date : Sat 7th November, 2026
- Closing Date : Fri 6th November, 2026
- ₹ 6340801.00
- NTID 47199231
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
63410.00 -
Document Cost
10000.00 -
Estimated Cost
6340801.00
BOQ Items Total Items : 190 | Total Qty : 10907.33
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORKS Dismantling brick or stone masonry in clay above 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead | 16.7 | cum |
| 2 | Dismantling and removing R.C.C. columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead | 0.84 | cum |
| 3 | Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C. | 91.15 | cum |
| 4 | Supplying and filling in foundation trenches and plinth with sand, well watered and rammed in layers not exceeding 23cm in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and , materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. | 87.53 | cum |
| 5 | Providing and lying Plain Cement Concrete of proportion (1:4:8) in foundation and floors using 4cm (1 1/2") 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading,cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | 33.91 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054