- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of KERALA STATE ELECTRICITY BOARD
- >
NTID 47078095
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair And Reconstruction Of D in Aluva - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair And Reconstruction Of D" in Aluva, India.
- Opening Date : Tue 3rd November, 2026
- Closing Date : Sat 31st October, 2026
- ₹ 517760.00
- NTID 47078095
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 12 | Total Qty : 699.469
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar (cost index(c) : 1.4445 included in Rate) | 10.6 | m3 |
| 2 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. (cost index(c) : 1.4445 included in Rate) | 100 | m2 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil (cost index(c) : 1.4445 included in Rate) | 26 | m3 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) (cost index(c) : 1.4445 included in Rate) | 3.2 | m3 |
| 5 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) (cost index(c) : 1.4445 included in Rate) | 22.9 | m3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054