- Home
- >
- Tender
- >
- Assam Tender
- >
- Department of Military Engineer Services
- >
NTID 43243909
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRepair And Maint Of 33 Kv Sub in Jorhat - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Repair And Maint Of 33 Kv Sub " in Jorhat, India.
- Opening Date : Sat 3rd January, 2026
- Closing Date : Thu 1st January, 2026
- ₹ 2500000.00
- NTID 43243909
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
50000.00 -
Document Cost
500.00 -
Estimated Cost
2500000.00
BOQ Items Total Items : 60 | Total Qty : 4981
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Specific Note: (a) One HS Electrician and one helper should be available for attending day to day complaints on all days including/Sunday and holiday from 09.00 hrs to 15.00 hrs . (b) Indls should be in possession of all required tools for rectification of complaints . (c) Labour charges and cost of reqired tools is deemed to be included in the rate quoted rate . (d) Work shall be executed by the authorised service mechanic/Engineer high skilled as approved by AGE/GE,to fter satisfacterily completion of servicing of HT Equipments. If any fault occurs upto completion of contract peried should be attended by concerned rep within stripulated time frame without any failure , quoted rates is deemed to be included all such charges. (e) Item no 1 to 40 If any above HT Equipment and connected itms become breakdown, the contractor shall loacate the problem/fault at site within 12 hours on intimation by JE/Engineer-In-Charge and ensure that the fault and rectified within 48 Hours , failing which an amount of Rs 200 /- per hour will be recovered as penal recovery from any payment due to contractor after expiry of 48 hours.) | ||
| 2 | M & L Testing, servicing and commissioning of 11 KV VCB and removing of breaker from existig HT panel and servicing to include cleaning, greasing,corbon removing with CRC/Jelly,Busbar cleaning,removing of sulphonification at Teminals/ busbars and checking the CT,PT working condition,fixing of insulated materials for Busbar and carried out calibration fro desired values (TMS,earth relay timing etc),complete testing and commissioning of 11 KV breaker capacity (As per existing Make / Model) (400 to 800 amp) for 11 KV VCB with panel Installed at different locations for proper functioning of the Installations complete all as specified and directed.( Each VCB will be servcied in one time in entire contract period.) Note:- (a) Visual Inspection (b) Checking of funtional locks, interlocks, signaling devices and auxiliary devices. (c) Checking of suitablility and correct operations of protections, control instruments and electrical connection of the circuit breaker operating mechanism. (d) Checking of Tripping Mechanism operation. (e) checking of Charging Limit Switch Operation (f) Checking with standard voltage on the auxiliary circuit. (g) Checking of with standard voltage at potential transformer. (h) Checking of Breaker ON/OFF operation manually and electrically. (j) Testing of vacuum Bottle integrity. (k) Relay testing. (l) Checking of the insulation resistance of VCB. (m) Verification of wiring. (n) Any spare Part if found unserviceable will be measured & paid separately as supply & fix in repair. | 21.00 | Each Job |
| 3 | M&L for Relay setting/Calibration of relay of HT VCB of 11 KV VCB complete all as specified directed. | 21.00 | Each Job |
| 4 | All as per Item No2, but 33/11 KV SF6 Circuit Breaker by opening all connections and checking all gases and same should be refilled.All Gases rate shall be deeemed to be included in this rate only. | 4.00 | Each |
| 5 | All as per Item No 2, but 33/11 KV MOCB Circuit Breaker. Note for Item No 2 to 5:- :i)Servicing equipment, moisture removing tools (Heating),cleaning tools,Insulated mtrl, for Busbars,Testing tools shall be deemed in quoted rates. ii)Testing report duly signed by authorised Technician and contractor will be submitted to Engr-in-charge after servicing. | 4.00 | Each |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054