Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation To Kanganinalla Mip" in phulbani, India.
- Opening Date : Sat 30th May, 2026
- Closing Date : Fri 29th May, 2026
- ₹ 23091000.00
- NTID 45169090
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
231000.00 -
Document Cost
10000.00 -
Estimated Cost
23091000.00
BOQ Items Total Items : 14 | Total Qty : 48152.97
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Clearing shrub jungles including uprooting stumps and small bushes and trees below 1m. girth based on pre-measurement including clearing the debris and depositing the same clear of work site with all leads & lifts including supply of all labour etc. complete in all respect as directed by the Engineer in charge. | 13655.650 | one sqm |
| 2 | Providing supplying drilling and injecting chemical emulsion in dam slopes including cost of all materials, labour , T&P required for work site etc. complete in all respect as directed by the Engineer in charge. | 9820.000 | one sqm |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter-spread with boulders up to cum. Size with all lifts and de-lifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge with all leads from the place of excavation complete in all respect as directed by the Engineer in charge. (measurement should be taken on finished level section) (over burden cutting) | 7223.680 | one cum |
| 4 | Excavation in all kinda of soil including moorum, stoney earth, gravel etc. except all kinds of rock and boulders exceeding 0.014 cum in volume for dam base stripping, cut off trenches, outfall drains and stripping in borrow area including dressing and dumping the excavated materials away from work site mannualy within initial lead of 50M and as per specification approved | 259.830 | one cum |
| 5 | Fine dressing and turfing to the slopes of the dam or dyke with approved quality of compacted dub grass with all leads & lifts including periodical watering with conveyance, collection of turf and supply of all labour and T&P materials required for the work etc. complete as directed by the Engineer in charge including mobilization and demobilization with all incidental charges to finish the item of work and making arrangement for survival of the grass till its full growth. (Measurement is to be taken after full survival of turf on finished level section). | 9820.000 | one sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054