- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of UTTAR PRADESH HOUSING AND DEVELOPMENT BOARD
- >
NTID 45170336
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenovation Of Road And Constru in Lucknow - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Road And Constru" in Lucknow, India.
UTTAR PRADESH HOUSING AND DEVELOPMENT BOARD
Lucknow, Uttar Pradesh, India
NTID 45170336
- Opening Date : Sat 30th May, 2026
- Closing Date : Sat 30th May, 2026
- ₹ 0.00
- NTID 45170336
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
874000.00 -
Document Cost
7080.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 172 | Total Qty : 118744.45785273
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | 1. Construction of Park work | ||
| 2 | Earth work in cutting or in embankment in ordinary soil excavation to be in regular pits not exceeding 0.5m depth and earth work in embankment to be in 20cm layer including ramming and dressing the surfaces level and slopes and also including 1.5m lift and 30m lead the earth from cutting to be used in making embankment area to be deposited as spoil bank with in 30m distance as directed by E/I. | 654.25 | cum |
| 3 | Providing and laying of cement concrete in 1:4:8 (1 cement 4 C.sand 8 40mm stone balast) including supply of all materials labour T&P etc.complete with form work as per direction by E/I., (For Toewall) | 152.34 | cum |
| 4 | Class 150 brick work (230 mm thick) in 1:6 cement and Hamirpur/Banda sand ( FM 1.5 to 2.0) mortar in super structure above plinth level upto floor two level (upto two storey) including necessary cutting and moulding of brickwork as required and also including supply of all materials, labour and tools and plants etc, required for proper completion of the work. | 229.91 | cum |
| 5 | Providing and laying in position Cement concrete in 1:1.5:3 (1cement : 1.5 coarse sand : 3 20mm graded stone aggrigate) excluding the cost of centering & shuttring all work upto plinth level | 57.56 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054