- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of Department Of Water Resources
- >
NTID 42662815
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenovation Of Indrahata Major in Murshidabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Indrahata Major " in Murshidabad, India.
Department Of Water Resources
Murshidabad, West Bengal, India
NTID 42662815
- Opening Date : Mon 1st December, 2025
- Closing Date : Thu 27th November, 2025
- ₹ 5357180.00
- NTID 42662815
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
107200.00 -
Document Cost
500.00 -
Estimated Cost
5357180.00
BOQ Items Total Items : 80 | Total Qty : 15582.6293
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | WTA for Major RLI Scheme | ||
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 21.84 | Cu.m |
| 3 | Earthwork in excavation of field trenches as per designed section & alignment for laying of pipelines (PVC, RCC, ACP etc.) upto a depth of 1500 mm in all sorts of soil including removing, spreading or stacking extra earth as directed. The item includes necessary trimming of sides, trenches, levelling, dressing and ramming the bottom as required cmplete. | 2483.01 | Cu.m |
| 4 | Earthwork in filling in trenches after laying pipelines (PVC, RCC, ACP etc.) with good earth obtained from excavation of field trenches in layers not exceeding 225 mm including watering & ramming etc. layer by layer complete (Payment will be made on the basis of measurement of finished quantity of work). | 2358.61 | Cu.m |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 15.73 | Cu.m |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054