- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of TATA INSTITUTE OF SOCIAL SCIENCES
- >
NTID 46551608
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenovation Of Board Room excl in Mumbai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Board Room excl" in Mumbai, India.
TATA INSTITUTE OF SOCIAL SCIENCES
Mumbai, Maharashtra, India
NTID 46551608
- Opening Date : Wed 23rd September, 2026
- Closing Date : Mon 21st September, 2026
- ₹ 891060.00
- NTID 46551608
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
18000.00 -
Document Cost
Refer Documents -
Estimated Cost
891060.00
BOQ Items Total Items : 11 | Total Qty : 295.8
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | ‘Renovation of Board Room (excluding AV system) at Naoroji Campus, TISS Mumbai’ | ||
| 2 | EARTH WORK Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 16.25 | litre |
| 3 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion © one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement: 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 43.2 | sqm |
| 4 | Treatment of existing masonry using chemical emulsion @ one litre per hole at 300 mm interval including drilling holes at 45 degree and plugging them with cement mortar 1:2 (1 cement : 2 coarse sand) to the full depth of the hole : With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 26.62 | metre |
| 5 | WOOD AND P. V. C. WORK Filling unit /Floor Filling Unit/ storage Unit made with 19 mm BWP ply with lamination at outer side and polishing inside with suitable number of shelfs and locking arrangements as directed by engineer incharge. Storage unit door shutters shall be laminated internally. Back side ply both side non laminated 12mm BWP Ply. | 6.78 | Sqm. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054