- Home
- >
- Tender
- >
- Jharkhand Tender
- >
- Department of WATER RESOURCES DEPARTMENT
- >
NTID 43220430
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRenovation Of Bhadaiya Bandh in Palamau - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Renovation Of Bhadaiya Bandh " in Palamau, India.
- Opening Date : Sat 3rd January, 2026
- Closing Date : Fri 2nd January, 2026
- ₹ 7389356.00
- NTID 43220430
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
147800.00 -
Document Cost
10000.00 -
Estimated Cost
7389356.00
BOQ Items Total Items : 29 | Total Qty : 29393.35
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Jungle clearance in borrow area, building premisses , flanks and slope of dam embankment by removing the grass a the jungle bushes from the top including weeding out shrubs including root and levelling etc. All complete as per specification and direction of E/I (SR. No. WRD 5.1.3.1 & Common- 2.02(iia)) | 0.160 | Ha |
| 2 | E/W in stripping by hydraulic M/C in grade A & B type of soil including morroum soil, soil mixed with kankar, pebbles, boulders upto 300 mm size and disposal of the same along with all organic materials in the country side beyond 150M. upto 500 M in all by tipper including construction & maintenance of haul road etc. all complete as per specification and direction of E/I. (SR No. WRD-5.1.6.1) | 243.950 | M3 |
| 3 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of the excavated earth as obtained to a distance upto 50 m and average lift of 1.5 m including levelling , ramming the foundation trenches , removing the roots of shrubs etc all complete as per specification and direction of E/I (SR No. WRD-7.1.27 ) | 472.380 | M3 |
| 4 | E/W in dam fill in semi previous or impervious zone excavation by Hydraulic Excavator and carriage by Tipper Truck making dam in proper design section including earth to be laid in layers of not more than 225 mm thick and breaking of clods to maximum 63 mm cube with all lifts including construction and maintenance of haul road etc. all complete as per specification and direction of E/I.Lead beyond 150 M but upto 500 M. (SR No. -WRD-5.1.22.1) | 12501.450 | M3 |
| 5 | Watering and consolidation of earth laid in 150mm to 225mm layers by manual labour with C.I.hammer to achieve minimum 85% of maximum dry density including supply of water and necessary tools and plants with all leads and lifts all complete as per specification and direction of E/I. (SR No.- WRD-7.1.38) | 12501.450 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054