- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY
- >
NTID 44664307
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRe Grassing Park Sector-61 tr in Noida - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Re Grassing Park Sector-61 tr" in Noida, India.
NEW OKHLA INDUSTRIAL DEVELOPMENT AUTHORITY
Noida, Uttar Pradesh, India
NTID 44664307
- Opening Date : Fri 10th April, 2026
- Closing Date : Thu 9th April, 2026
- ₹ 9857534.00
- NTID 44664307
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
197200.00 -
Document Cost
2832.00 -
Estimated Cost
9857534.00
BOQ Items Total Items : 26 | Total Qty : 141710.36
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). | 11283.73 | Cum |
| 2 | Supplying and stacking at Site Dump Manure form Approved Source Including carriage upto 5 k.m.lead complete (Cattle manure measured in Stacks will be reduced by 8% for Payment). | 1206.99 | Cum |
| 3 | Supplying and stacking of good earth at site including royalty and carriage upto 05 km lead complete (earth measured in Stacks will be reduced by 20% for payment). | 1070.76 | Cum |
| 4 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately) | 664.92 | Cum |
| 5 | Rough dressing the trenched ground including breaking clods. | 37612.46 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054