- Home
- >
- Tender
- >
- Uttarakhand Tender
- >
- Department of COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH
- >
NTID 42657379
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowRcc Frame And Aac Block Masona in Roorkee - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Rcc Frame And Aac Block Masona" in Roorkee, India.
COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH
Roorkee, Uttarakhand, India
NTID 42657379
- Opening Date : Mon 17th November, 2025
- Closing Date : Fri 14th November, 2025
- ₹ 0.00
- NTID 42657379
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
8500.00 -
Document Cost
590.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 8 | Total Qty : 2351
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.00 | Cum |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form for: RCC Shelves / slabs / RCC walls (Cast in Situ) | 39.00 | Sqm |
| 3 | Steel reinforcement(Labour work only) for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete at site(excluding the cost of reinforcement): Cold twisted bars | 1400.00 | Kg |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 32.00 | Sqm |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 24.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054