- Home
- >
- Tender
- >
- Jammu and Kashmir Tender
- >
- Department of Military Engineer Services
- >
NTID 43209362
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProvn Of Rcc Retaining Wall At in Samba - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Provn Of Rcc Retaining Wall At" in Samba, India.
Military Engineer Services
Samba, Jammu and Kashmir, India
NTID 43209362
- Opening Date : Thu 8th January, 2026
- Closing Date : Tue 6th January, 2026
- ₹ 14905000.00
- NTID 43209362
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
224060.00 -
Document Cost
1000.00 -
Estimated Cost
14905000.00
BOQ Items Total Items : 13 | Total Qty : 80866.3
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Material and Labour for earth work in rough excavation by mechanical means (Hydraulic excavator) (not exceeding 1.5m deep), including including getting out in any type of soil or all kind soil and disposal of surplus excavated lead upto 50 m and lift upto 1.5m complete all as specified and as directed by Engineer-in-Charge. | 1813.00 | Cum |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge. | 1775.00 | Cum |
| 3 | Material & labour for Cement concrete M-10 (Nominal Mix) (1:3:6) type C-2 (using 40mm graded crushed stone aggregates) in foundation fillings and mass concrete complete all as specified and directed. | 91.60 | Cum |
| 4 | M&L for reinforced cement concrete M-25 (Design Mix) (using 20mm graded crushed stone aggregates) as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc and mass concrete complete all as specified and directed. | 465.80 | Cum |
| 5 | Material & labour for formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter for rough finished flat surfaces complete all as specified and directed. | 292.00 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054