NTID 44700433
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProviding Compound Wall And La in silvassa - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Providing Compound Wall And La" in silvassa, India.
- Opening Date : Thu 9th April, 2026
- Closing Date : Thu 9th April, 2026
- ₹ 5627245.00
- NTID 44700433
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
113000.00 -
Document Cost
1000.00 -
Estimated Cost
5627245.00
BOQ Items Total Items : 26 | Total Qty : 16830.04
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil | 563.35 | Cu.mt |
| 2 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(A) Loose or soft soil | 119.25 | Cu.mt |
| 3 | Filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. | 682.60 | Cu.mt |
| 4 | Providing material and labour for laying Plain cement concrete M15 in Foundation and Plinth including cost of formwork, compacting, finishing, curing etc complete for all level, all height/ depth as directed by engineer in charge. | 201.13 | Cu.mt |
| 5 | Providing and laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of columns and Mass concrete. (upto 10 ton) | 68.69 | Cu.mt |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054