- Home
- >
- Tender
- >
- Gujarat Tender
- >
- Department of Deendayal Port Trust
- >
NTID 45101432
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProviding Common Approach Road in Kandla - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Providing Common Approach Road" in Kandla, India.
- Opening Date : Refer Documents
- Closing Date : Fri 5th June, 2026
- ₹ 717002319.00
- NTID 45101432
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
14340046.00 -
Document Cost
5900.00 -
Estimated Cost
717002319.00
BOQ Items Total Items : 13 | Total Qty : 2563982
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | "Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 6744.000 | M3 |
| 2 | Providing primary rock of 0.1 to 0.5T for road work/ground including cost of quarrying, royalty, loading, unloading, transportation and spreading in layers from existing ground to required level, levelling, dressing side slopes etc., complete with all labour and materials etc., as directed by the engineer in charge. | 473970.000 | MT |
| 3 | Supplying and stacking of quarry spall /Ganular material for emabnakement of Approach roads/plot with including cost of excavation, royalty, loding, unloding transportation complete with all labour and materials or as directed by Engineer in Charge. | 680000.000 | MT |
| 4 | Laying,spreading,compacting and shifting of Quarry Spalls material with loading, unloading and tranasproting. The material shall be spread in uniform thicness and compacted in layers using vibratory rollers of 8-10 capacity with watering to achivce proper grade and camber. The work shall include consolidation to meet specified compaction values and surface accuracy,complete in all respects as directed by the EIC | 425000.000 | M3 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1283.000 | M3 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054