- Home
- >
- Tender
- >
- Tamil Nadu Tender
- >
- Department of V O CHIDAMBARANAR PORT TRUST
- >
NTID 43165443
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProviding And Fixing Of Overhe in Tuticorin - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Providing And Fixing Of Overhe" in Tuticorin, India.
V O CHIDAMBARANAR PORT TRUST
Tuticorin, Tamil Nadu, India
NTID 43165443
- Opening Date : Mon 5th January, 2026
- Closing Date : Fri 2nd January, 2026
- ₹ 0.00
- NTID 43165443
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
260770.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 12 | Total Qty : 710
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork excavation in trenches for foundation in dense or hard soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage of water wherever necessary etc., complete complying with AISS and as directed by the departmental officers. | 200.00 | Cum |
| 2 | Providing and laying Plain Cement Concrete 1:4:8 (One part of cement, 4 parts of M. Sand (Crushed Stone Sand) & 8 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers. | 15.00 | Cum |
| 3 | Providing Form work including centring, shuttering for foundation footings of columns, mass concrete so as to give a rough finish shuttering and propping etc., complete complying with AISS and as directed by the departmental officers. | 210.00 | Sqm |
| 4 | Fabricating and placing in position of M.S / Tor steel grills for R.C.C works in all floors including cost of Steel, cutting, bending, binding with 16 Gauge GI Binding wire and placing in position etc., complete complying with AISS and as directed by the departmental officers. | 6.0000 | MT |
| 5 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (One part of cement, One and a half parts of M. Sand (Crushed Stone Sand) & Three Parts of graded stone aggregate (i.e.) 2 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., and excluding the cost of form work and reinforcement grills for all RCC works in all floors upto full height of the building etc., complete complying with AISS and as directed by the departmental officers. | 75.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054