- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION
- >
NTID 46108895
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowProtection To Right Bank Of Ri in Angul - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Protection To Right Bank Of Ri" in Angul, India.
- Opening Date : Mon 10th August, 2026
- Closing Date : Fri 7th August, 2026
- ₹ 0.00
- NTID 46108895
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
24500.00 -
Document Cost
6000.00 -
Estimated Cost
Refer Documents
BOQ Items Total Items : 4 | Total Qty : 1000.4
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earthwork excavation in all kinds of soil including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying the excavated earth in layers not exceeding 0.30m depth with levelling the bed and disposing the excess earth away from worksite including cost of all labour, T&P with cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 93.6 | One Cum |
| 2 | Supplying (1.00M x 1.00M x 1.00M) size G.I. Crates consisting 10cm x 10cm mesh of G.I. wire of 10 S.W.G stitching the G.I. crates with 20 S.W.G wire and laying together filling the crates with hard stone boulders above 0.003 cum in size of approved quality and dumping in position including cost,carriage, royalty, taxes of all materials, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per drawing, specification, direction of the Engineer-in-charge. | 240 | One No. |
| 3 | Quarrying, collecting, supplying and stacking of other than hard granite stone above 0.003 cum in volume from quarry free from weather skin surface and other deleterious materials including dumping the stones in rip-rap of spur and slope protection works including surface packing in all heights and depths including filling the interstices, wedging and packing surface to proper line levels including dumping in water etc.complete including cost,carriage, royalty, taxes of all materials, cost of all labour, T&P with all cost of incidental charges and cess etc.complete as per drawing, specification,direction of the Engineer-in-charge. (Measurement to be taken in level section &1/6th voids will be deducted from the finished level section.) | 602 | One Cum |
| 4 | Quarrying, collecting, supplying and stacking of other than hard granite stone above 0.003 cum in volume from quarry free from weather skin surface and other deleterious materials including packing the stones in slope protection works in river embankment to required profile in all heights and depths including filling the interstices with small stones, wedging and hammering and packing surface to proper line and levels including fixing wave breakers including cost,carriage, royalty, taxes of all materials, cost of all labour, T&P with all cost of incidental charges and cess etc.complete as per drawing, specification,direction of the Engineer-in-charge. | 64.8 | One Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054