NTID 46077790
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPropesed Construction Of Aspir in Palamau - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Propesed Construction Of Aspir" in Palamau, India.
- Opening Date : Mon 10th August, 2026
- Closing Date : Sat 8th August, 2026
- ₹ 2814157.00
- NTID 46077790
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
56283.00 -
Document Cost
10000.00 -
Estimated Cost
2814157.00
BOQ Items Total Items : 125 | Total Qty : 5608.98
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil & disposal of surplus excavated soil as directed, within or outside the site at an unobjectionable place.i) All kinds of Soil | 110.78 | CUM |
| 2 | Extra for earth work in hard soil as per specification and direction of E/I. (vide classfication of soil item - B) | 38.62 | CUM |
| 3 | Filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5M all complete as per building specification and direction of EA (Mode of | 64.33 | CUM |
| 4 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | 0.95 | CUM |
| 5 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2 | 32.315 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054