- Home
- >
- Tender
- >
- Gujarat Tender
- >
- Department of Military Engineer Services
- >
NTID 43857597
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPeriodical Energy Audit Of Pow in Kalol - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Periodical Energy Audit Of Pow" in Kalol, India.
- Opening Date : Fri 27th February, 2026
- Closing Date : Wed 25th February, 2026
- ₹ 600000.00
- NTID 43857597
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 2 | Total Qty : 2
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Deployment of man power, instrument, tools and all connected accessories for carry out load survey for a period of 24 hrs at the MRS/incoming panels/VCBs/RMUs at various electrical installation at Area 'A' & 'C' to carry out electrical analysis of HT and LT of Transformer. This incl checking the efficiency of transformer, its loading pattern, PF, THD, best efficiency point of existing losses in the system. Providing suggestions to achieve energy efficiency and energy saving of system this incl all distribution Transformers of Stn complete all as specified and directed by Engr-in-Charge. (a) Tranformer - 14 No's (b) DG Set - 10 No's (c) Voltage stabilizer - 08 No's (d) APFC Panel - 07 No's (e) Water Supply Instalation - 03 No's (f) Pump & Motor - 08 No's (g) RMU - 09 No's (h) VCB - 03 No's | 1.00 | Each Job |
| 2 | Deployment of man power, instrument, tools and all connected accessories for carry out load survey for a period of 24 hrs at the MRS/incoming panels/VCBs/RMUs at various electrical installation at Area 'B' to carry out electrical analysis of HT and LT of Transformer. This incl checking the efficiency of transformer, its loading pattern, PF, THD, best efficiency point of existing losses in the system. Providing suggestions to achieve energy efficiency and energy saving of system this incl all distribution Transformers of Stn complete all as specified and directed by Engr-in-Charge. (a) Tranformer - 7 No's (b) DG Set - 6 No's (c) Voltage stabilizer - 05 No's (d) APFC Panel - 05 No's (e) Water Supply Instalation - 01 No's (f) Pump & Motor - 06 No's (g) RMU - 05 No's (h) VCB - 02 No's Notes for Item Ser No 1 & 2 above : Contractor is advised to visit the stn before quoting the tender to get a proper idea about the prevailing site condition and to get a proper idea of scope pf work. It is requested to go through the PS Clause at page No 86 to 94 | 1.00 | Each Job |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054