- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Maharashtra Rural Road Development Agency
- >
NTID 43187830
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowPackage No Adb ii Sat-br-06 in Satara - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Package No Adb ii Sat-br-06" in Satara, India.
Maharashtra Rural Road Development Agency
Satara, Maharashtra, India
NTID 43187830
- Opening Date : Wed 24th December, 2025
- Closing Date : Mon 22nd December, 2025
- ₹ 49624000.00
- NTID 43187830
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
248000.00 -
Document Cost
17700.00 -
Estimated Cost
49624000.00
BOQ Items Total Items : 169 | Total Qty : 27483.70184361
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | 1) CONSTRUCTION OF SUBMERSIBLE BRIDGE ACROSS BANGANGA RIVER ON MDR 67 (TR-09) TO PHADTAREWASTI ROAD VR-217 TAL.PHALTAN CHAIN No. 0/375. Excavation for foundation of structures upto 3 m as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 252.391 | Cubic meter |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. II. Ordinary rock (not requiring blasting ) Upto 3 m depth | 424.063 | Cubic meter |
| 3 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. IV. Hard rock (blasting prohibited ) Upto 3 m depth including 1.5 m depth in hard rock | 304.406 | Cubic meter |
| 4 | Dewatering including diversion of stream, providing cofferdams bunds etc. as may be necessary for foundation and other parts of the work and bailing out water during and after excavation as required. | 720.000 | Hrs |
| 5 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 &1203 P.C.C grade M 15 (i)Nominal mix 1:2.5:5 | 23.431 | Cubic meter. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054