Inquiry NowOperation And Maintenance Of S in Delhi - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Operation And Maintenance Of S" in Delhi, India.
- Opening Date : Wed 5th August, 2026
- Closing Date : Wed 5th August, 2026
- ₹ 2902908.00
- NTID 46122736
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
58058.00 -
Document Cost
Refer Documents -
Estimated Cost
2902908.00
BOQ Items Total Items : 19 | Total Qty : 2715
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Supplying & Erection of Hot Dipped galvanized 10 meter height octagonal pole with 1.5 meter long double arm Hot Dipped Galvanized GI bracket in approved design capable of holding the minimum weight of the luminaire. The pole structural design shall be as per ILE TR7 considering the wind speed as per IS:875, the HT steel for construction should be as pre BSEN10025 grade S355Jo, minimum thickness 3 mm, hot dip galvanizing on both internal and external surfaces as per IS:2629/ IS:2633/ IS:4759 with average coating thickness of 65/70 microns through a single dipping process. The pole shall also be provided with hinged/chained flush door of length not less than 300 mm at an elevation of 1.0 m (approx.) from the base plate with proper strengthening to the cutout of the door opening. Each pole shall be complete with a bakelite sheet complete with DIN Rail, 2/6 amps, 10KA SPN MCB, Screwless DIN mounting connectors suitable for cable terminations complete with Grade) of min. 20 mm dia each with three GI nuts and two GI washers etc. complete as per drawing. The pole shall have a minimum of OAF of 175mm at bottom and minimum of 70 mm at top. The pole bottom shall be enclosed with 200 mm dia DWC pipe upto a height of 2.5 mtr. to avoide theft and electrocution. The pole shall have a section thickness of not less than 3 mm, base plate minimum 275mm x 275mm x 16mm with 250 mm dia DWC pipe to cover/enclose the pole from prevention of the electrocution. The pole shall be fabricated in a single section. ...........................Cont.................................... | ||
| 2 | Pole foundation size must be 900 mm (L) x 900 mm (W) x 700 mm (D) using (1:2:4) reinforced cement concrete foundation with 20 Nos. 10 mm TMT Bars, 12 mm of 5.6 mtr. and 8 mm of 3.2 mtr. required etc. complete as required. The pole and pole foundation should be approved from Engineer- in-charge before starting of work. | 35 | Each |
| 3 | LED Street light fixture, powder coated pressure die cast aluminium body (System lumen efficacy ≥120 <135 lm/Watt) Supplying of Street light LED fixture powder coated pressure die cast aluminium body with driver as per the requirement with Driver efficiency >85%, Input voltage: 140-270 Volt AC, frequency 50/60 hz, Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%,THD < 10% as per IEC 61000-3-2, P. F.≥0.95, IP-66,IK-10, CRI >70, under voltage and over voltage rotection, EMIEMC As per CISPR 15 , lenses for beam angle as per IESNA type I/II/III as per the width of the road and the project requirement., suitable to fit in up to 65mm dia pipe, life time (LED, Driver & electrical circuitry) of minimum 50000 Burning Hours with 70% of nitial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM(Standard Deviation Colour Matching) <5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥120 <135 m/Watt output. LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-charge as per requirement. (Thermal management: heat sink of Aluminium housing such that LED junction temperature shall to rise above 90°C). | ||
| 4 | 200 watt | 70 | Each |
| 5 | Supplying and laying of following size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc. in the existing trench, complete as required. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054