- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Public Works Department
- >
NTID 43240344
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowNh19 Se Bhikharipur Hotey Huwe in Mughalsarai - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Nh19 Se Bhikharipur Hotey Huwe" in Mughalsarai, India.
Public Works Department
Mughalsarai, Uttar Pradesh, India
NTID 43240344
- Opening Date : Wed 24th December, 2025
- Closing Date : Wed 24th December, 2025
- ₹ 3246000.00
- NTID 43240344
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
325000.00 -
Document Cost
945.00 -
Estimated Cost
3246000.00
BOQ Items Total Items : 4 | Total Qty : 878.47
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 610.00 | Cum |
| 2 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 50.00 | Cum |
| 3 | RCC Grade M20 using batching plant transit mixer & manual placing(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 202.00 | Cum |
| 4 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 16.47 | Tonne |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054