Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "New Construction Work Of Pota " in Bulandshahr, India.
Public Works Department
Bulandshahr, Uttar Pradesh, India
NTID 43234087
- Opening Date : Wed 24th December, 2025
- Closing Date : Wed 24th December, 2025
- ₹ 8280000.00
- NTID 43234087
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
614000.00 -
Document Cost
2714.00 -
Estimated Cost
8280000.00
BOQ Items Total Items : 27 | Total Qty : 30971440.15
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Part (A) Bituminous Part Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 45.00 | Cum |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 4550.00 | Cum |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 170.00 | Cum |
| 4 | Cement Treated Sub base (Cement Treated Sub base) Providing, laying and spreading in uniform layers with motor grader on a prepared sub grade/sub base cement @2% by wt. to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined copmressive strength to form a layer of Sub-base. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 316.00 | Cum |
| 5 | Cement Treated Sub base (Cement Treated base) Providing, laying and spreading in uniform layers with motor grader on a prepared sub base cement @4% by wt. to the spread material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined copmressive strength to form a layer of Sub-base. Including cost of, all material, labour, T&P and Labour cess etc. complete but excluding GST. | 384.00 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054