- Home
- >
- Tender
- >
- Tripura Tender
- >
- Department of Director Agriculture
- >
NTID 45173134
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowMission For Integrated Develop in Lembucherra - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Mission For Integrated Develop" in Lembucherra, India.
Director Agriculture
Lembucherra, Tripura, India
NTID 45173134
- Opening Date : Tue 19th May, 2026
- Closing Date : Tue 19th May, 2026
- ₹ 1962398.00
- NTID 45173134
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
39248.00 -
Document Cost
1000.00 -
Estimated Cost
1962398.00
BOQ Items Total Items : 35 | Total Qty : 3138.3
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil.(A.)Pole=225 nos X0.30 m X 0.30 m X 0.60 m=12.15 cum,Panel base=2 X1.50 X0.45 X 0.30=0.405cum ,2 X 1.00 X 0.45 X 0.30=0.27 cum | 12.82 | Cum |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.(Pole=225 nos X0.30m X 0.30 mX 0.100m=2.025 cum) Panel base=1.50 X 1.00 X 0.100 =0.15 cum ,1.00 X 0.50 X 0.400 =0.20 cum SOR-2023 | 2.375 | Cum |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: a)1:5:10 ( 1 Cement: 5 fine sand : 10 graded well burnt brick aggregate 40 mm nominal size) (Pole=225 X0.30 X 0.30 X 0.100=2.025)SOR-2023 | 2.025 | Cum |
| 4 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)(A)Pole=225 nos X0.30m X 0.30m X 0.70m=14.175 cumSOR-2023 | 14.18 | Cum |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) Panel base=1.50 x1.00 x 0.100 =0.15 cum, 1 .00 x 0.50 x0.400=0.20 cum,SOR-2023 | 0.35 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054