- Home
- >
- Tender
- >
- Andaman and Nicobar Islands Tender
- >
- Department of ANDAMAN LAKSHADWEEP HARBOUR WORKS
- >
NTID 47272040
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowMinor Repair Works At Haddo Wh in Nicobar Island - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Minor Repair Works At Haddo Wh" in Nicobar Island, India.
ANDAMAN LAKSHADWEEP HARBOUR WORKS
NTID 47272040
- Opening Date : Tue 10th November, 2026
- Closing Date : Mon 9th November, 2026
- ₹ 0.00
- NTID 47272040
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
315699.00 -
Document Cost
Refer Documents -
Estimated Cost
Refer Documents
BOQ Items Total Items : 17 | Total Qty : 10375
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Cutting and removing RCC/rich mix by using pavement breaker and air compressor , including the cost of hire charges of pavement breaker and air compressor, all labour charges charges for breaking stacking of unserviceable and servieable materials , gas, cutter, minor tools including GST & LWC etc., complete. | 59.5 | Cum |
| 2 | Providing and laying PCC M20 (1:1.5:3 - one cement, one and half mainland river sand & three stone chips) using 20 mm. graded stone chips , Mainland River Sand, Cement, approved plasticizer, silica fume for cast-in-situ concrete items for wearing coat etc. including cost of nominal shuttering, cement, silica fume, plasticizer, cost of stone chips, mainland river sand, all labour charges for mixing, conveying, placing, consolidation, screening and washing of stones chips and sand, transportation charges of all materials to Work Site and running charges of batching plant, vibrator, consumables and all other equipments required for this work , cost of minor tools and plant, GST,LWC etc. complete. | 59.5 | Cum |
| 3 | Providing and fixing Tor steel reinforcement (TMT BARS FE500) for R.C.C. works including cost of steel, cutting of steel, bending, binding and placing in position, cost of binding wire, cost of transportation charges of all materials to worksite, all labour charges, cost of minor tools, LWC & GST etc., complete. | 30 | Qtl. |
| 4 | Conveying the dismantled concrete/debris by truck and dumping within a lead of 14km as directed by the EIC, including cost of all materials, hire charges of truck including POL and operator, minor tools, LWC & GST etc., complete. | 60 | Cum |
| 5 | Scaffolding : Providing and fixing double scaffolding system (cup lock type ) on the exterior side, up to seven storey height made with 40mm dia M.s tube 1.5 m center to centre with M.S tube , M.S Challies , M.S Clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings runners, connection with the building etc. wherever required for inspection roof work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer -in-charge . The plan/elevation area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding including cost of all materials, all labour charges, transportation charges minor tools, LWC & GST etc., complete. | 900 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054