- Home
- >
- Tender
- >
- Chhattisgarh Tender
- >
- Department of South Eastern Coalfields Limited
- >
NTID 43208626
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowMasonry Construction Of 22 Nos in Pendra - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Masonry Construction Of 22 Nos" in Pendra, India.
South Eastern Coalfields Limited
Pendra, Chhattisgarh, India
NTID 43208626
- Opening Date : Sat 3rd January, 2026
- Closing Date : Thu 1st January, 2026
- ₹ 4475254.00
- NTID 43208626
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
56000.00 -
Document Cost
Refer Documents -
Estimated Cost
4475254.00
BOQ Items Total Items : 12 | Total Qty : 18823.34
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in coal/shale/stone for grip cutting in side/bottom/top up gallery by pick axes/chiseling of exposed surface removal of estimated of coal/shale & stacking separately serviceable & unserviceable material with in a distance of 50m. (For coal/shale) (Item No. 2(d) of GMSOR 2019). | 67.21 | m3 |
| 2 | Excavation in coal/shale/stone for grip cutting in side/bottom/top up gallery by pick axes/chiseling of exposed surface removal of estimated of coal/shale & stacking separately serviceable & unserviceable material with in a distance of 50m. (For stone) (Item No. 2(b) of GMSOR 2019). | 6.83 | m3 |
| 3 | Reinforcement cement concrete work 1:2:4 ( 1 cement : 2 sand : 4 stone aggregate 20mm and down gauge) upto plinth level including vibrating, tamping, curing etc. and loading, unloading the materials into mine car/tub and carriage of materials by manual labour for a lead of 50 m. both at surface and underground but excluding cost of reinforcement. (Item No. 5 of GMSOR 2016). | 98.67 | m3 |
| 4 | Reinforcement cement concrete work 1:2:4 ( 1 cement : 2 sand : 4 stone aggregate 20mm and down gauge) in wall, column, buttress including vibrating tamping, curing etc. and loading, unloading the materials into mine car/tub and carriage of materials by manual labour for a lead of 50 m. both at surface and underground but excluding cost of reinforcement. (Item No. 6 of GMSOR 2016). | 148 | m3 |
| 5 | Providing centering & shutter with props and removal of the same all complete including loading ,unloading the materials in to mine car /tub and carriage of materials by manual labour for a lead of 50mtrs both at surface and underground. - For Foundation and plinth. (Item No. 13(a) of GMSOR 2016) | 197.3 | m2 |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054