ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowMaintenance Upgradation Of Ro in Gautam Budnagar - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Maintenance Upgradation Of Ro" in Gautam Budnagar, India.
Uttar Pradesh State Industrial Development Corporation Limited
Gautam Budnagar, Uttar Pradesh, India
NTID 43115572
- Opening Date : Mon 29th December, 2025
- Closing Date : Mon 29th December, 2025
- ₹ 23834678.00
- NTID 43115572
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
562498.00 -
Document Cost
6269.00 -
Estimated Cost
23834678.00
BOQ Items Total Items : 17 | Total Qty : 29633.86
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches. | 2166.23 | Cum |
| 2 | Concrete with 4cm gauge stone ballast, coarse sand & cement in poroportion of 8:4:1 (8 graded stone aggregate: 4 coarse sand : 1cement : ) including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge | 393.08 | Cum |
| 3 | M-150 Brick work in 1:4 one cement : 4 coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 770.13 | Cum |
| 4 | Concrete with 2cm gauge stone grit , coarse and cement in proportion of 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 212.52 | Cum |
| 5 | 12mm thick plaster with cement and course sand of 2.20 finesess modules mortar in 1:4 over brick work minimum thickness not to be less than 1cm. Including supply of all materials, labour, tools & plants etc. required for proper completion of the work. | 3111.50 | Sqm |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054