- Home
- >
- Tender
- >
- Maharashtra Tender
- >
- Department of Public Works Region
- >
NTID 43927580
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowIntegrated Develop Plan For Pr in Tuljapur - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Integrated Develop Plan For Pr" in Tuljapur, India.
Public Works Region
Tuljapur, Maharashtra, India
NTID 43927580
- Opening Date : Thu 5th March, 2026
- Closing Date : Mon 2nd March, 2026
- ₹ 4386924739.00
- NTID 43927580
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
21919000.00 -
Document Cost
5900.00 -
Estimated Cost
4386924739.00
BOQ Items Total Items : 2042 | Total Qty : 2507668.178
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | PART A - WORK PORTION | ||
| 2 | Cutting down trees including trunks and branches with girths above 30 cm. to 60 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 290.000 | Nos |
| 3 | Cutting down trees including trunks and branches with girths above 60 cm. to 90 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 201.000 | Nos |
| 4 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. by Mechanical Means. for all depths. | 22614.850 | Cum |
| 5 | Excavation for foundation in hard murum bolder including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. by Mechanical Means, for all depths | 13602.883 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054