- Home
- >
- Tender
- >
- Odisha Tender
- >
- Department of BHUBANESWAR DEVELOPMENT AUTHORITY
- >
NTID 44644592
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowImprovement Of Main Road And O in Khorda - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Improvement Of Main Road And O" in Khorda, India.
- Opening Date : Thu 16th April, 2026
- Closing Date : Wed 15th April, 2026
- ₹ 23033799.00
- NTID 44644592
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
230338.00 -
Document Cost
11800.00 -
Estimated Cost
23033799.00
BOQ Items Total Items : 68 | Total Qty : 67783.857
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in Stoney earth soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the earth transported by transport vehicles as directed by the Engineer-In-charge. | 923.775 | Cum. |
| 2 | Excavation of founation in hard rock (granite) removed by chiselling including dressing and levelling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50m and as per specification approved by the Department | 54.243 | Cum. |
| 3 | Excavation of founation in hard rock (other than granite) removed by pick axes & crow bars including dressing and levelling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50m and as per specification approved by the Department. | 372.040 | Cum. |
| 4 | Carriage of earth by mechanical means with cost of all lead & lift upto 5 km including cost of all labour, T&P etc., comp. | 2014.275 | Cum. |
| 5 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,labour cess, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge. (Measurement will be taken on finished compacted section only). | 648.864 | Cum. |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054