- Home
- >
- Tender
- >
- West Bengal Tender
- >
- Department of ZILLA PARISHAD
- >
NTID 43060366
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGwm With Leach Pit And Conveya in BAGDOGRA - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Gwm With Leach Pit And Conveya" in BAGDOGRA, India.
ZILLA PARISHAD
BAGDOGRA, West Bengal, India
NTID 43060366
- Opening Date : Mon 5th January, 2026
- Closing Date : Thu 1st January, 2026
- ₹ 349954.00
- NTID 43060366
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
BOQ Items Total Items : 19 | Total Qty : 641088.651
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. b) Depth of excavation not exceeding 1,500 mm. | 52.450 | CUM |
| 2 | (II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety. In ground floor (a) 1:3:6 proportion | 18.920 | CUM |
| 3 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. NB. -- This rate only for Northern Circle, NBCC-I & NBCC-II | 74.700 | SQM |
| 4 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth | 2.850 | CUM |
| 5 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 3.410 | SQM |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054