Inquiry NowGroup-29 Construction Of Pcc in Gumla - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "Group-29 Construction Of Pcc " in Gumla, India.
- Opening Date : Thu 5th November, 2026
- Closing Date : Wed 4th November, 2026
- ₹ 1161300.00
- NTID 47275743
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
23300.00 -
Document Cost
2500.00 -
Estimated Cost
1161300.00
BOQ Items Total Items : 15 | Total Qty : 1037.73
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | CIVIL WORKS | ||
| 2 | Erath work in excavation in foundation trenches in ordinary soil ( vide classification of soil item - A ) and disposal of excavated earth as obtained to a distance upto 50 M including all lifts , leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I. | 206.79 | M³ |
| 3 | Providing coarse clean localsand filling in foundation trenches or in plinth including ramming and wtering in layers not exceeding 150mm thick with all leads and 1.5 M lifts including cost of all materials, labours , royalty and taxes all complete as per building specification and direction of E/I. | 103.4 | M³ |
| 4 | Supplying and laying ( properly as per design and drawing) rip-rap with good quality of Boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carraige all complete as per specification and direction of E/I. | 103.4 | M³ |
| 5 | Providing and laying in Position cement concrete of Specified grade excluding the cost of centering and shuttering - All work upto plinth level (1:2:4) (1 cement : 2 Sand (Zone - III): 3 graded stone aggregate. | 103.4 | M³ |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054