- Home
- >
- Tender
- >
- Uttar Pradesh Tender
- >
- Department of Moradabad Development Authority
- >
NTID 43718099
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry Now6-govindpuram Awasiya Yojana M in Moradabad - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "6-govindpuram Awasiya Yojana M" in Moradabad, India.
Moradabad Development Authority
Moradabad, Uttar Pradesh, India
NTID 43718099
- Opening Date : Wed 18th February, 2026
- Closing Date : Tue 17th February, 2026
- ₹ 21127123.00
- NTID 43718099
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
422600.00 -
Document Cost
5900.00 -
Estimated Cost
21127123.00
BOQ Items Total Items : 15 | Total Qty : 96252.566
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | Boundary Wall Works Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. D.S.R. 2023 Item No. 2.8.1 | 1011.41 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) D.S.R. 2023 Item No. 4.1.8 | 141.96 | Cum |
| 3 | Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) D.S.R. Item No. 5.1.3 | 32.40 | Cum |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) RCC Work for Raft Footing, D.S.R. 2023 Item No. 5.1.2 | 257.256 | Cum |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works above plinth level upto floor V level Concrete of M25 grade with minimum cement content of 330 kg /cum D.S.R. Item No. 5.33.2.1 | 287.77 | Cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054