- Home
- >
- Tender
- >
- Kerala Tender
- >
- Department of Public Works Department
- >
NTID 47272556
ProcXpert
Share Your purchase requirement, Our ProcXpert team will Connect you to right Supplier.
Inquiry NowGeneral-sabarimala Work -2026- in Angamaly - Complete Tender Details
Find eligibility criteria, important deadlines, bidding requirements, and download official documents for "General-sabarimala Work -2026-" in Angamaly, India.
- Opening Date : Mon 16th November, 2026
- Closing Date : Thu 12th November, 2026
- ₹ 84321976.00
- NTID 47272556
Tender Description
Documents
Get Complete Tender Details Now - Download the Document!
Download Now – Only ₹200-
Document-1
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
-
Document-2
721.3 kBOil_India_ExtraDoc...Oil_India_ExtraDocument-GCO0449P23.pdf
Costs
-
EMD
200000.00 -
Document Cost
13010.00 -
Estimated Cost
84321976.00
BOQ Items Total Items : 45 | Total Qty : 119173.585
| # | Item | Quantity | Units |
|---|---|---|---|
| 1 | ROAD WORK | ||
| 2 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 4286.975 | cum |
| 3 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 15.005 | cum |
| 4 | 55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 11.09 | cum |
| 5 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 3.315 | cum |
Purchase Access To Download Selected Documents
₹ 200
Select this PlanFor a one-time fee, you get unrestricted access to all documents and for a minimum of one year.
UNLIMITED
DOWNLOAD
Select this Plan
₹ 7000
Plan
Standard Plane
Day/Month
Standard Plane
Sales: +91 7383 93 4054